Search

Lakeside Solar Project

In development
Lakeside Solar

The Lakeside Solar Project is projected to be up to a 200 megawatt (MW) solar development project located in Muskegon County, Michigan. Lakeside will span approximately 1,700 acres and will be connected to the Du Pont – Cobb Transmission Line.

Lakeside Solar is anticipated to positively impact the environment, as well as the local economy by producing tax revenue, jobs, and contributions through a charitable fund.

Lakeside Solar will provide energy and capacity for the transmission network and will connect to the electric grid at the Du Pont – Cobb Transmission Line. The project’s footprint will consist of approximately 1,700 acres signed under agreement and has ideal conditions for solar energy generation.

Project Benefits

NGR_Icons_34x34_TaxRev
$74 million in local benefits like taxes and landowner payments over the 25-year life of the project
NGR_Icons_34x34_Charity
$800,000 in charitable giving over 20 years, or up to $40,000 annually
NGR_Icons_34x34_Co2
213,850 metric tons of carbon dioxide emissions annually during operations
NGR_Icons_34x34_Car
46,200 the equivalent number of cars removed from the road every year

*Calculations estimated based on National Renewable Energy Laboratory (NREL) JEDI Model and current state tax law for solar facilities. Subject to change.

Anticipated Commercial Operation Date

2025

Onsite Contact Info

General Inquiries

Contact Form

Feedback Form

This website uses cookies to better understand how visitors use our site, for advertising, and to offer you a more personalized experience. By using this website with cookies enabled in your browser, you agree to their use by this site. For more information, please review our privacy policy.