Exie Solar Project

In development
Exie Solar logo

The Exie Solar Project is an up to 150 megawatt (MW) solar energy project and nonregulated transmission line located in Green County, Kentucky. The Exie Solar Project would include various equipment, including, without limitation, solar panels, inverters, battery energy storage systems, aboveground and underground collection lines, a transmission line, and a project substation and switchyard.

Spanning approximately 1,800 acres, the project will be connected to the Summershade to Greene County 161kV line. Exie Solar is anticipated to positively impact the environment as well as the local economy by producing tax revenue, jobs, and contributions through a charitable fund.

Public Participation and the Permitting Process

Under Kentucky Law, electric generating facilities capable of producing 10 MW or more and non-regulated transmission lines capable of carrying 69,000 volts or more must apply for a Construction Certificate from the Kentucky Electric Generation & Transmission Siting Board (Siting Board). This process provides for a single unified process by which facilities can obtain a certificate to operate. Generally speaking, the Siting Board process includes a public informational meeting, submittal of certificate application, Siting Board staff and consultant review, public hearing, evidentiary hearing, and certificate issuance/denial.

The Project docket, once established, will be the best way to stay informed about the Project, and a PDF of the certificate application will be available upon submission. Once the project docket is established, a link will be provided on this website.

For more information on the Siting Board process, visit the guide linked below.

View Kentucky Electric Generation & Transmission Siting Board Guide to Public Participation

Current Status

Exie Solar anticipates filing its application for the Exie Solar Project with Siting Board around June 2025. Prior to application submittal, Exie will host a public information meeting. Details about the public information meeting can be found below. Construction of the Exie Solar Project is scheduled to commence as early as 2027. The Exie Solar Project is scheduled to be in service as early as 2028.

Public Information Meeting

Exie Solar is holding a public informational meeting regarding the Exie Solar Project on Thursday, March 20, 2025 from 5:00 p.m. – 7:00 p.m. at Longhunters Coffee & Tea, 115 S Public Sq, Greensburg, KY 42743-1532. The purpose of this meeting is to present the Exie Solar Project to the public and obtain feedback on the Project from the community. The public informational meeting will be held in an open house format. Representatives from the Project, including many subject matter experts, will be available for one-on-one conversation. Information about the Project developer, facility location, construction process, environmental studies, and economic benefits of the project will be provided at various stations at the meeting location.

Project Benefits

Economic Impact icon
$53.8 million in direct economic impact over the first 20 years of operations
NGR_Icons_34x34_TaxRev
$10.6 million in new tax revenue over first 20 years of operation
NGR_Icons_34x34_Charity
$750,000 in charitable giving during the first 20 years of operation
NGR_Icons_34x34_Co2
183,900 metric tons of carbon dioxide emissions offset per year
NGR_Icons_34x34_Car
43,700 the equivalent number of cars removed from the road every year

*Calculations estimated based on National Renewable Energy Laboratory (NREL) JEDI Model and current state tax law for solar facilities. Subject to change.

Anticipated Commercial Operation Date

2028